
|
Client Address |
Date of Assessment |
|
|
F/C Identification |
|
|
|
Equipment Type |
|
|
|
Location |
|
|
|
Last Test |
|
|
Doors - Closed |
Window - Closed |
|
|
|
Details |
Pass |
Fail |
|
|
1 |
Inspect and check baffle |
|
|
|
2 |
Inspect interior chamber |
|
|
|
3 |
Inspect sash mechanism for corrosion and damage |
|
|
|
4 |
Inspect condition of extract ducting (where accessible) |
||
|
5 |
Check airflow face velocity and controls including flow rate indicator, alarm, and high sash alarm |
|
|
|
6 |
Service outlets and drainage |
||
|
7 |
Check Waterjet System (Perchloric Fume Cupboards only) |
Velocity Profile (Meters/Second)
Fan Speed (Slow, Fast, Single, Variable) Fume Cupboard instrument outline
|
|
||||
|
Average Face Velocity ___________m/s |
Optimum Working Height _________ |
|
Max Sash Opening _________ |
Smoke Test _______OK _________ |
Remarks Recommendations :
Action Required |
YES |
NO |